SUCCESS STORY

Monson I 

  • Status: Operational
  • Location: Monson, MA (Hampden County)
  • Congressional District: Massachusetts 1st 
  • Technology(s): Solar
  • Relevant Tax Provision(s): Investment Tax Credit (ITC)
  • Fast Fact:
    • Monson I provides 3 MW of solar power to the town of Monson, MA.

SUCCESS STORY

Factorial Energy 

  • Status: Operational
  • Location: Methuen, MA (Essex County)
  • Congressional District: Massachusetts 3rd
  • Technology: Battery Manufacturing
  • Relevant Tax Provision: Manufacturing Production Tax Credit (45X)
  • Fast Facts:
    • Factorial Energy opened its battery manufacturing facility in Methuen, MA in 2023. Factorial invested $50 million and at full capacity, the facility will create 150 local jobs. 
    • The 200 MWh factory will be the largest solid-state battery assembly line in the U.S.
    • Thanks to the Manufacturing Production Tax Credit (45X), Factorial will build its solid-state battery cells here in the U.S., bolstering the domestic supply chain for critical minerals and batteries.